The first signs of the construction project rising from the ground are now visible outside the existing Vo-Ag building. The steel frame for the vestibule and hallway are being erected this week, after a pause for the snow and ice the last 10 days.
🚧Construction Updates - "We're Going Vertical"
January 28, 2020