The groundwork for the PAC is almost done. The footings, foundation, and drainage are all in the final stages - and when complete, the structure can start to rise! Pictured above is the termination point for the storm and roof drains, over 100 yards from the PAC site.
🚧Construction Updates - "Where Does All The Water Go?"
December 4, 2019